Back in 2000, we pushed out the front wall of the house by
5 1/2 feet, and removed those horrid arches. The result was
a much bigger kitchen with room
for an actual family.
Then, in the fall of 2005, we started a major remodel
of the whole house. It began by stripping everything
down to the drywall in all the rooms but the kitchen.
We added new doors, windows, trim, and retextured and
painted it all. In the master bedroom, we ripped out
the closet and bathroom, and moved them around for a
much more practical arrangement.
The second half of the
work was done in the winter and spring of 2006,
where we added a new wing off the back of the house.
The existing dining and family rooms moved out by
seven feet, and connecting to a new wing with and
office for Dave, a laundry room, and a large wreck
room. Here's a little QuickTime tour through the
addition part of the way through the work.

